Built to Last Through Desert Conditions
Exterior tile installation services built for outdoor spaces in St George, Utah.
When you're adding or updating outdoor tile in St George, the installation needs to account for temperature shifts, direct sun exposure, and the occasional freeze that can crack improperly set surfaces. Your pool deck, patio surround, or entryway will be exposed to conditions that indoor flooring never faces, and that means selecting materials rated for slip resistance and thermal movement while setting them on a substrate prepared to drain water correctly.
Kartchco Construction installs exterior tile for residential and commercial properties across St George, working with porcelain, natural stone, and ceramic products selected for durability in Southern Utah weather. Installation begins with evaluating the existing surface or base, preparing a leveled substrate with proper slope for drainage, and setting tile with thinset and grout formulated to flex slightly as temperatures change. Each material is chosen for its ability to resist fading, chipping, and moisture infiltration over years of use.
If you're planning a pool deck, outdoor kitchen surround, or hardscape feature that includes tile, reach out to discuss material options and site preparation for your St George property.
What happens during the installation process
Your installation in St George starts with site preparation, which may involve removing old pavers or concrete, grading the area to ensure water flows away from structures, and compacting a stable base layer before any tile is set. The substrate is then covered with a cement backer board or mortar bed that allows for drainage and prevents tile from cracking when the ground settles or shifts.
Once the tile is set and grouted, you'll notice consistent spacing between each piece, a surface that feels stable underfoot, and edges that align cleanly with adjacent hardscape or pool coping. The grout lines are sealed to resist staining and moisture penetration, and the entire installation is left to cure before regular use begins.
Installation timelines depend on the size of the area and whether any grading or demolition is required, but most residential projects are completed within a few days once materials arrive. Larger commercial installations or jobs requiring custom cuts around curves or water features may take longer, and weather conditions can affect curing times during cooler months.
Questions about tile or what to plan for
Homeowners and property managers in St George often ask about material choices, maintenance requirements, and how outdoor tile holds up compared to other hardscape options, so the following answers address the most common concerns before installation begins.
If you're ready to move forward with exterior tile for your St George property, Kartchco Construction can provide material recommendations and a project quote based on the size and layout of your outdoor space.